Boosting
The momentum for electrification is accelerating, with a surging demand for electric vehicles (EVs) from both individual motorists and industrial businesses. Ensuring the right fast-charging infrastructure is crucial to support this growth. However, existing electrical grid infrastructures often struggle to meet the high output required for EV fast charging. Upgrading grid capacity involves lengthy processes and substantial investments.
Reference Cases
Two charging stations with 160 kW each have been installed at the fuel station, showcasing our capability to support high-demand charging infrastructure.
Exide supplied 9 Solition Powerboosters with 30kW / 33 kWh each, capable of charging 18 industrial trucks and recharging themselves throughout the day.